00:00:00.370 --> 00:00:09.210
Oh, I don't know, they just randomly tamed you

00:00:09.210 --> 00:00:12.290
They played yesterday

00:00:12.290 --> 00:00:54.160
Persons, Clem, here, Johnson, here, Simmons is absent, Parker, here, Stacy, here, Shadle, here, Sanders is absent, Sellers

00:00:54.160 --> 00:00:58.700
And we have a quorum

00:00:58.700 --> 00:01:00.500
Thank you

00:01:00.500 --> 00:01:03.060
If we could join me in the Pledge of Allegiance

00:01:03.060 --> 00:01:09.400
I pledge allegiance to the flag of the United States of America

00:01:09.400 --> 00:01:12.480
And to the republic for which it stands

00:01:12.480 --> 00:01:18.180
One nation, under God, indivisible, with the liberty of justice for all

00:01:18.180 --> 00:01:24.880
Thank you

00:01:24.880 --> 00:01:28.000
And we need approval of the agenda if we could

00:01:28.000 --> 00:01:57.760
So moved. I second. Motion by Klemm, second by Johnson. All in favor? Aye. Opposed? And we need an approval of the minutes from October 20, 2025. Motion to approve. Second. Motion by Klemm, second by Johnson. All in favor? Aye. And opposed? That motion carries. We've got public comment. Is anybody signed?

00:01:58.000 --> 00:01:59.300
I don't think so

00:01:59.300 --> 00:01:59.900
I don't think so

00:01:59.900 --> 00:02:02.000
Seeing none

00:02:02.000 --> 00:02:04.700
We will move on to item seven

00:02:04.700 --> 00:02:06.500
Discussion of the following budgets

00:02:06.500 --> 00:02:08.660
The water operating

00:02:08.660 --> 00:02:09.940
Sewer operating

00:02:09.940 --> 00:02:11.000
Storm operating

00:02:11.000 --> 00:02:12.000
Water capital

00:02:12.000 --> 00:02:12.920
Sewer capital

00:02:12.920 --> 00:02:14.480
Storm capital

00:02:14.480 --> 00:02:15.320
Fire pension

00:02:15.320 --> 00:02:16.560
And police pension

00:02:16.560 --> 00:02:17.760
Manager Boyer

00:02:17.760 --> 00:02:25.370
Thank you, Mr. Chair

00:02:25.370 --> 00:02:30.710
As we just discussed

00:02:30.710 --> 00:02:32.970
We'll be starting with the water operating budget

00:02:32.970 --> 00:02:39.580
Okay

00:02:39.580 --> 00:02:40.600
Just

00:02:40.600 --> 00:02:41.940
We'll start with revenue

00:02:41.940 --> 00:02:54.700
glasses on. Kind of hard to read without your glasses. So grant revenue, we have about $3.6 million budgeted for

00:02:54.700 --> 00:03:02.200
2026. So that includes lead service line phase four and water service, or I'm sorry, water main replacement

00:03:02.200 --> 00:03:11.520
grant from Congressman Sorensen. Also our residential services, we are bringing in about $1.6 million there.

00:03:11.520 --> 00:03:21.000
and that includes our CPI for our annual water rate increase. Moving down to capital improvement

00:03:21.000 --> 00:03:28.900
surcharge, $2.1 million will be revenue there and that's steady from last year. And then we have other

00:03:28.900 --> 00:03:35.640
revenue. We're bringing in an additional, we're budgeting to receive another $100,000 in PFAS

00:03:35.640 --> 00:04:09.010
Settlement to come in next year. Overall, net increase, or I'm sorry, interest income, we're lowering our projection from last year to $250,000. So that's our water revenue. Any questions on that? Okay. All right, moving on to the expense side. I'm not going to hit every single line item here. I'm just going to hit some of the main ones. We did some reorganization with the labor for water this year.

00:04:09.030 --> 00:04:16.150
we've moved. So some of the staff was previously categorized as water strictly, but they actually do

00:04:16.150 --> 00:04:22.470
both. So we have made those adjustments. That's why you see an apparent decrease here in labor plant, but

00:04:22.470 --> 00:04:30.390
that's not actually a decrease. That's just reflecting the new, the way we organized it for 26, and we'll be

00:04:30.390 --> 00:04:36.210
going forward in the future in that way. In addition to that, obviously, we've got our standard withholdings

00:04:36.210 --> 00:04:42.650
and health insurance, life insurance, those various items. So those are a portion of our total labor.

00:04:43.630 --> 00:04:51.970
Down at item 6170, that's contracted infrastructure repairs and maintenance. We're budgeting $2.9 million

00:04:51.970 --> 00:04:58.930
there and that includes the lead service line replacement program phase number three. Also we have

00:04:58.930 --> 00:05:05.910
some fencing scheduled to be installed around Carroll tank and we're also going to do a willow tank

00:05:05.910 --> 00:05:36.250
Inspection. Isn't that right? Yes. Yep. So with that, let's see here. Moving down here, we've got a few others. $6670,000 building supplies. We've got $75,000 budgeted for expansion of the Brick Street machine storage building. We're planning to expand on that. It's kind of a pole shed construction at the end of Brick Street.

00:05:36.250 --> 00:05:44.870
Additionally, we've got $150,000 in for mains and manholes, and this includes five I-hydrants, is that correct?

00:05:46.310 --> 00:05:47.070
Or is it ten?

00:05:47.090 --> 00:05:47.830
I believe it was seven.

00:05:48.150 --> 00:05:49.850
Seven, I'm sorry, seven I-hydrants.

00:05:49.850 --> 00:05:57.270
So I-hydrants are the newer water hydrant or fire hydrants you've seen around town that have a little taller hat on them.

00:05:57.350 --> 00:06:04.670
Those are the ones that communicate water pressure, acoustic information, and lead us to water main breaks when they occur.

00:06:04.670 --> 00:06:12.170
and can also help us track back what caused them to begin with. Just skipping down to safety equipment,

00:06:12.470 --> 00:06:20.630
we're budgeting under 6735 under supply safety equipment. We're budgeting for some more barricades

00:06:20.630 --> 00:06:26.690
with all the road work we've been doing. We're at a minimum in terms of our barricades, although we

00:06:26.690 --> 00:06:32.750
bought some last year. There's just not enough to set up the construction zones appropriately. So we're

00:06:32.750 --> 00:06:41.090
budgeting to have some additional barricades added. I'd also like to move to 7010 machinery and equipment.

00:06:42.150 --> 00:06:54.370
We're budgeting in this item for a pull-behind signboard. If you notice, we've had a, so several years ago, we invested in a signboard, and maybe it was in 2019.

00:06:55.090 --> 00:07:01.470
There's been some issues with that one, and the circuitry and things have failed in it, so we'll be replacing that next year.

00:07:01.470 --> 00:07:17.590
and then also we're looking at a 4,500 truck with crane and an additional aero board. So this is replacing some equipment, aging equipment and increasing capacity with another aero board. Any questions on the water budget?

00:07:19.430 --> 00:07:21.670
What is bad debt?

00:07:23.510 --> 00:07:36.140
Bad debt expense is where we have uncollectible water bills. So anything else?

00:07:36.140 --> 00:07:58.800
I just wanted to point out the arrow boards and the other arrows that we require, most of the water and sewer work that we do is in the right-of-way, in the streets, and through some safety audits that we've done, we've determined that those items are needed for our workers to have safe trespass out in the street during these construction projects that we're doing.

00:07:58.800 --> 00:08:26.200
Okay, with that, I'd like to move on to the sewer fund. So first we'll discuss the revenue side. So right now, residential service, we're pulling in about $3 million per year. So that's the annual sewer rate. And that is increased by the CPI, as we mentioned, in the water budget. Same situation there.

00:08:26.200 --> 00:08:51.480
In addition to that, we're transferring in, and this is down at the bottom at $49.60, we're transferring in $1.5 million from the Lamb Road TIF for the Walnut Street lift station that we plan to build next year. That will be helpful for a number of reasons, but that's planning to be constructed next year. Any questions on revenue?

00:08:51.480 --> 00:09:21.520
Okay. Moving on to the expense side. We're budgeting for a little bit more chemical expense this year. We've raised it to $175,000. Chemicals keep going up in price. That'd be everything related to wastewater treatment. So that in some cases, that's polymer. In some cases, that's chlorine. But all the chemicals have been slowly increasing over the years.

00:09:21.520 --> 00:09:50.720
Also we've got engineering that $200,000 and that would be assisting us with all the projects and things that we are working on next year related to sewer. We also have equipment building and plant outside services. Under that item we were projecting that we'll be doing a replacement of a boiler and pumping piping for the

00:09:51.520 --> 00:09:59.800
Wastewater Plant, also some building expenses related to upfitting some of the buildings and fixing them.

00:09:59.800 --> 00:10:31.160
some of the buildings and fixing them. And then raw sewage or raw sludge pumps that essentially conveys the sludge from the treatment process to the digesters. And then we have the biologically activated filtration blower. We're scheduling to replace that blower number two next year, as well as the digester pump. Skipping down a little further to 6390. Oh, I'm sorry.

00:10:31.680 --> 00:10:39.460
6425 lab testing. This is outside testing, so we're budgeting $20,000 this year for additional

00:10:39.460 --> 00:10:46.500
perfluorinated compound testing. The EPA is looking to start regulating what we send out into our

00:10:46.500 --> 00:10:52.360
receiving streams when it comes to the forever chemicals, and we had to budget for that additional

00:10:52.360 --> 00:11:04.740
testing for next year. And again, in this item, we're budgeting for some additional barricades. What we

00:11:04.740 --> 00:11:38.530
did this year was we basically took the needs of the utility and we divided them half over water, half over sewer. So we're budgeting $9,500 for additional safety equipment in the form of barricades. Any questions on the sewer operations budget? Okay. With that, I'd like to go over storm sewer. There's not a whole lot changing in the revenue on storm, the storm sewer fund. We have essentially the same revenue coming in this year as we did last.

00:11:38.530 --> 00:12:05.570
So nothing really changing there. On the expense side, we're accounting for the wages related back to the new AFSCME contract. And if you go down to 6170, contracted infrastructure repair and maintenance, we're planning to spend about $300,000 repairing storm inlets. So we've identified multiple failing inlet structures throughout the town.

00:12:05.570 --> 00:12:35.550
it certainly isn't all of them but it's targeting the worst ones and that's so that we don't have a cave-in and have it tear up the road and have more of an emergent situation. And then lastly we're budgeting on 7010 machinery and equipment. We're adding a ditching bucket for the storm fund here. This would be an attachment that goes on to our excavator. It's wider and it would allow someone to ditch efficiently.

00:12:35.570 --> 00:12:41.650
along the side of the road. A couple of examples of ditching that needs to be done. We're working in the

00:12:41.650 --> 00:12:47.630
arcade right now, 18th Avenue. The ditches have basically silted in or been deliberately filled in.

00:12:48.130 --> 00:12:53.590
And so when we go and do road work, and La Crest is another good example, whenever we go to do that type

00:12:53.590 --> 00:12:57.590
of work, we need to make sure that we have the right tools. In this particular case, a ditching bucket is

00:12:57.590 --> 00:13:05.550
the tool we need for our excavator. So any questions on storm sewer fund? I just have the 6170. Oh,

00:13:05.570 --> 00:13:06.010
I'm sorry.

00:13:06.190 --> 00:13:06.710
No, go ahead.

00:13:07.150 --> 00:13:09.950
The 6170 that you talked about.

00:13:10.090 --> 00:13:10.270
Yes.

00:13:10.350 --> 00:13:11.450
How many more of those?

00:13:11.730 --> 00:13:15.710
I know you said we're looking to watch the breakage and all that.

00:13:15.810 --> 00:13:16.110
How many?

00:13:16.690 --> 00:13:18.070
How many inlets is that?

00:13:18.310 --> 00:13:18.530
Yeah.

00:13:18.870 --> 00:13:22.410
Well, they cost around $10,000 to $15,000 per inlet, thereabout.

00:13:23.170 --> 00:13:25.210
So, you know, that's quite a few.

00:13:25.470 --> 00:13:27.070
We're probably talking $20,000 to $30,000.

00:13:27.490 --> 00:13:27.670
Oh.

00:13:28.070 --> 00:13:28.290
Yep.

00:13:28.850 --> 00:13:30.950
But you're not going to try to do them all that year.

00:13:31.310 --> 00:13:34.710
I mean, it'll take over how long?

00:13:34.710 --> 00:13:36.790
No, we're going to get these done in 20 seconds.

00:13:36.850 --> 00:13:37.210
Oh, okay.

00:13:38.830 --> 00:13:39.650
Was it more than that?

00:13:40.210 --> 00:13:40.730
I'm sorry?

00:13:41.030 --> 00:13:42.170
How many were we planning to do?

00:13:42.570 --> 00:13:44.210
No, you're right on the amount.

00:13:44.930 --> 00:13:55.490
Well, I wanted to point out one of the reasons that we don't have a ton of expense this year is we still have some projects that are in motion that are going to change from the $30,000 that we spent this year.

00:13:55.490 --> 00:14:01.330
We have some big emergency work that's going out in the Sioux basement for some storm issues that we have.

00:14:01.330 --> 00:14:31.310
and this 300,000 for storm inlets is desperately needed we're finding more and more we were able to include some of them into the project mix this year as we were doing water mains and streets but we're finding a lot more that are old structures that are falling apart and so we plan to do a program this year where we target maybe 50 of them and do a package at a time to have those replaced all at once to get it done much faster okay thank you okay with

00:14:31.310 --> 00:14:58.530
With that, I'd like to move on to our first capital budget. So this would be water projects. I would encourage you all to have a look at this. There's quite a bit going on here, but this is essentially our five-year capital plan for water. Next year, the projects that we're going, we're planning to work on, and I'm not going to discuss every project on here. I'm just going to stick with 26, but we have water main replacements for road projects. We're budgeting about $820,000 for those.

00:14:58.530 --> 00:15:28.290
Viaduct improvements at Shawnee and Hancock we're hoping to that that project's going to carry through the year so we need to have a little bit in the budget for next year. The lead service line phase four as you can see $2.7 million and that is all 100% forgivable loans from the Illinois EPA. We have water structures phase three so that's well 12. So as you can see here we've got about 15 million budgeted for

00:15:28.530 --> 00:15:58.050
2026 and another 16 million budgeted for 2027 and obviously that's adding up to about 31 million dollars and we're hoping to have final documentation here pretty in hand to demonstrate the funding mechanism on that. If you'll skip down to well eight we're gonna one of our goals is to install a backup generator at Carroll Tank and if you may not be aware but all of our remote sites so

00:15:58.050 --> 00:16:05.390
Carroll, Willow, a lot of the lift stations, they don't have their own backup generator capacity.

00:16:05.750 --> 00:16:15.590
So if we ever had a major storm with a pretty serious power outage, we would be in a hurt locker trying to keep all those facilities up and running.

00:16:16.550 --> 00:16:19.550
So we're starting with Carroll, we're adding a backup generator there.

00:16:20.630 --> 00:16:24.810
And then we've got the Brick Street cold storage upgrades.

00:16:25.070 --> 00:16:27.550
We have 67,000 in that.

00:16:28.050 --> 00:16:34.050
and then also the Willow tank rehab. So we're budgeting about a million dollars. So that's the

00:16:34.050 --> 00:16:38.730
ground level storage tank over at Willow. It's time for us to get in there, clean it out. It hasn't been

00:16:38.730 --> 00:16:44.270
cleaned in many years. And so we're going to go in there, clean that out, install proper hatches and

00:16:44.270 --> 00:16:51.510
properly sized hatches as well for us to be able to maintain it in the future. So any questions on the

00:16:51.510 --> 00:16:52.730
Water Capital.

00:16:53.630 --> 00:16:54.510
Alderman Stacy?

00:16:55.490 --> 00:17:00.570
Water main phase four and five, it says pending loan.

00:17:01.010 --> 00:17:02.050
Yes, yes.

00:17:02.470 --> 00:17:09.230
So these are identifying that we're planning for water main replacements, where the funding is going to come from.

00:17:09.290 --> 00:17:10.670
It could come from a number of sources.

00:17:10.670 --> 00:17:19.230
One could be like we have had recently with Congressman Sorensen providing $900,000 in water main replacement.

00:17:19.230 --> 00:17:32.330
If we don't have that, we'll look at what we can get in terms of loan forgiveness and also loans from the EPA. So that's the two main, it's either grants or it's going to be an EPA loan.

00:17:32.930 --> 00:17:35.470
Are funds like that even available now?

00:17:37.290 --> 00:17:47.690
Well, we've had pretty good luck here recently. So I'd say, I mean, even if it goes down a little bit, we're going to continue to seek outside funding for all this as often as possible.

00:17:47.690 --> 00:17:50.050
Can I say something?

00:17:51.510 --> 00:18:07.910
Although, Stacy, those are in the 27 and 28 lines, and so Congressman Sorensen's monies are appropriated in the fall or the wintertime of the previous, so we wouldn't know that until closer to those timeframes.

00:18:07.910 --> 00:18:30.990
But in general, when we do roadway repair, we need to budget money for water main replacements because many of the roads we need to replace also need that water main replaced. Otherwise, we'll be setting ourselves up for future deterioration, accelerated deterioration with water main breaks. Any other questions on the water capital?

00:18:31.890 --> 00:18:32.550
Greg, if I...

00:18:32.550 --> 00:18:33.050
Olin McClum.

00:18:33.490 --> 00:18:38.470
Nothing on Brick Street as far as demo or anything until after the new well's done?

00:18:39.050 --> 00:18:39.570
Well...

00:18:39.570 --> 00:18:41.090
Just a question, you know.

00:18:41.110 --> 00:18:42.330
It is in here.

00:18:43.510 --> 00:18:44.130
Let's see where.

00:18:47.350 --> 00:18:49.230
It's water main.

00:18:49.710 --> 00:18:51.010
It's water structures.

00:18:53.250 --> 00:18:54.010
That's okay.

00:18:54.130 --> 00:18:55.950
I just had the question over.

00:18:56.390 --> 00:18:56.910
Okay.

00:18:57.190 --> 00:18:58.590
There it is, about halfway down.

00:18:58.890 --> 00:19:00.430
Phase seven, Brick Street.

00:19:00.610 --> 00:19:00.770
Yeah.

00:19:00.990 --> 00:19:01.210
Gotcha.

00:19:01.510 --> 00:19:03.030
Phase seven, and we pushed that.

00:19:03.330 --> 00:19:05.770
It's scheduled for 27 right now.

00:19:06.090 --> 00:19:06.350
Mm-hmm.

00:19:06.510 --> 00:19:06.790
So.

00:19:06.990 --> 00:19:07.410
Thank you.

00:19:07.570 --> 00:19:07.730
Yep.

00:19:10.860 --> 00:19:11.420
Okay.

00:19:11.560 --> 00:19:13.940
Wastewater treatment plants for 26.

00:19:13.940 --> 00:19:15.860
We're completing phase one.

00:19:16.860 --> 00:19:19.120
We believe that's going to be an additional $30 million.

00:19:19.720 --> 00:19:23.220
And that was budgeted for when we took on, when we started the project.

00:19:23.560 --> 00:19:26.200
That's funded through EPA loan.

00:19:26.200 --> 00:19:29.920
And we also received $5 million in loan forgiveness on that project.

00:19:31.040 --> 00:19:35.440
We have the Park Street lift station and Galena lift station.

00:19:35.800 --> 00:19:39.900
Both of those are scheduled with $500,000 for varying needs.

00:19:40.040 --> 00:19:43.300
Some of them need upgraded pumps, motors, drivers, and controllers.

00:19:43.940 --> 00:19:57.320
And so that's where that's coming from. Park is a pretty substantial lift station, so we need to make sure we're staying on top of the maintenance on that. We've also budgeted $500,000 for sewer lining, $50,000 for manhole.

00:19:57.320 --> 00:20:00.620
$50,000 for manhole reconstruction or lining.

00:20:00.960 --> 00:20:03.840
So I'm sorry, not reconstruction, it would be manhole lining.

00:20:04.400 --> 00:20:11.520
And then we have about $250,000 we need a budget for maintenance of our clarifiers, the wastewater treatment plant.

00:20:12.080 --> 00:20:15.000
And that could be anything from the rake drives to the skimmers.

00:20:15.500 --> 00:20:21.660
Basically, we need to take them down and service them and get the gearboxes replaced and remanufactured.

00:20:21.660 --> 00:20:30.540
also we have a we're planning to put in a lift station generator at Park in Galena looks like a fairly large

00:20:30.540 --> 00:20:35.940
amount 1.9 million but there's a fairly large lift station so we want to make sure that as I mentioned

00:20:35.940 --> 00:20:41.280
to you before if we have an extended power outage with a storm the last thing I want is my guys driving

00:20:41.280 --> 00:20:46.700
around in a truck with a big generator behind them running around from from site to site so we need to

00:20:46.700 --> 00:21:16.680
get as many of these set up with generators as possible. And then also the walnut lift station, we're budgeting $1.5 million in the capital budget for that. So that'll be moving forward here shortly. We've also got the wastewater treatment plant blower room boiler and piping. So new boilers required there. And then we have the Meadowbrook sewer expansion. So we're going ahead of budgeting $1.2 million for Meadowbrook.

00:21:16.700 --> 00:21:46.680
Brook due to the fact that we've been waiting on unsewered communities grant for quite a while and at this point the road has deteriorated pretty substantially and we can't just replace the road unless we're putting sewer in so we need to go ahead and plan for that so that's what we're doing on that. And then we also have West Demeter sewer expansion. West Demeter is on our road replacement program for this year and we need to replace the sewer or add sewer when we go down

00:21:46.680 --> 00:22:16.200
West Demeter. So any questions on the wastewater? Yes. I just wanted to know the generator that's going to be on Park and Galena, where at will that be? Well, where would it be located? So, okay, Park and Galena is a little bit of a misdome. Are we talking about the big one right there on Galena? Right? Right off. Yeah. So did you have a answer for that one? Yeah. So Park is at the corner of

00:22:16.200 --> 00:22:26.520
Laurel and Park. That's the big lift station on the corner. And then the one on Galena, so it's actually two different stations, is the one that's out on Galena, West Galena, near Cherokee Hills.

00:22:26.960 --> 00:22:29.500
Oh, okay. Thank you.

00:22:29.500 --> 00:22:43.840
Yep. Okay. Now with that, I'd like to move on to stormwater projects. So we've got a handful of items here for 26.

00:22:43.840 --> 00:23:08.080
Thanks. The largest one is, as we discussed, the storm inlet replacement program that we just briefly discussed. Also, we'll have some bills coming in on the viaduct at Hancock and Shawnee, so we'll need to be paying those bills as we wind down that project. And then we also have a downtown stormwater program, so this is basically to address the issue at Benton and Jackson.

00:23:08.080 --> 00:23:32.020
There's a large stormwater inlet there, well, actually outfall to the river, and that is deteriorating. It needs to be repaired. So that and also behind the old McNess, there's another stormwater outfall that needs maintenance. So any questions on stormwater?

00:23:32.020 --> 00:23:35.750
Okay

00:23:35.750 --> 00:24:04.970
So just to help give some definition to it those stormwater large projects for downtown Kiwanis Sioux those are all we've submitted for EPA forgivable grants for a certain portion of those and we have submitted been over a year ago but we've just kind of been held up in delay there we're expecting some of those to release in this next year

00:24:06.050 --> 00:24:07.050
Very good

00:24:07.050 --> 00:24:11.170
All right, I'd like to move on to vehicles

00:24:11.170 --> 00:24:16.650
We have, so this is for water, sewer, and storms

00:24:16.650 --> 00:24:19.350
So these would be water and sewer trucks

00:24:19.350 --> 00:24:22.690
We're budgeting for one 10-yard dump truck this year

00:24:22.690 --> 00:24:26.490
And one F-550 with crane

00:24:26.490 --> 00:24:28.250
Our existing crane

00:24:28.250 --> 00:24:35.330
Sometimes you need a crane when you're lifting large line shaft pumps out of their wet wells

00:24:35.330 --> 00:25:07.970
So this truck will be equipped with that. Any questions on the vehicles? Okay, coming down to the last little bit here, fire pension fund. So starting with revenue, we've got about $815,000. That's our annual contribution from the city. And then $360,000 is what we receive from our employees that contribute to the retirement fund.

00:25:07.970 --> 00:25:17.550
And then unrealized gains or losses, we're budgeting about $4.5 million in invested proceeds to help with that.

00:25:18.230 --> 00:25:24.990
Then on the expense side, the major ones here, now obviously you have the benefits to retirees at $3.9 million.

00:25:25.750 --> 00:25:34.290
And then investment management fees, that is $64.15, and those are fees associated with the Firefighters Pension Investment Fund.

00:25:34.290 --> 00:26:08.140
And then lastly, other professional services, that's Eamon Lauterbach for our bookkeeping fees. So that comes to about $60,000. Any questions on the fire pension fund? Okay. Both the fire and police pension quarterly meetings were rescheduled from last week to November 12th. There may be small changes when we get to the end of the budget process that we need to reflect going forward. Okay.

00:26:08.140 --> 00:26:30.260
On the police pension, similar to fire, so the annual contributions from the city is about $445,000 with about $370,000 coming from the policemen and then invested proceeds of about $4.5 million is budgeted for next year.

00:26:30.260 --> 00:27:02.670
As I mentioned before, $64.15 investment management fees, we've got about $75,000, and those are fees associated with the Illinois Police Officers Pension Investment Fund. And then in addition, we have professional services with Lauterbach and Amen for bookkeeping, and that's $52,000. Any questions on the police or fire pensions? Okay. Well, with that, that concludes my presentation.

00:27:03.110 --> 00:27:19.280
Thank you, Manager, Boyer. Number, item eight is a discussion regarding tax abatement ordinances. We have no name on that.

00:27:19.780 --> 00:27:20.500
No, we don't.

00:27:20.620 --> 00:27:23.780
I can be.

00:27:25.600 --> 00:27:26.120
Director.

00:27:29.740 --> 00:27:39.020
I just want to point your attention to the memo that was attached to that line item. This is kind of an informational thing because we will be seeing

00:27:39.020 --> 00:27:48.540
ordinances to abate our bonds coming up at one of our future meetings. And this just kind of explains why we do

00:27:48.540 --> 00:27:55.420
that. I'll just go through the memo really quick. Thank you. Go. When general obligation bonds are

00:27:55.420 --> 00:28:01.920
issued, they are backed by the city's ability to levy and collect property taxes. Therefore, the county

00:28:01.920 --> 00:28:10.380
automatically levies the required annual debt service from City of Freeport property owners on their property tax bills.

00:28:11.280 --> 00:28:18.400
The city has historically abated or canceled this amount on the property taxes. By passing an ordinance

00:28:18.400 --> 00:28:25.200
each year, the property taxes that would otherwise be collected from residents is abated. The city

00:28:25.200 --> 00:28:34.640
instead makes the debt service payments from other city revenues. On the memo is a list of our individual

00:28:34.640 --> 00:28:40.560
bond issues, the amount to be abated, and the source of the revenue that will be used to make the bond

00:28:40.560 --> 00:28:48.940
payment. We have also included the potential increased cost in property taxes on a $100,000 home if these

00:28:48.940 --> 00:28:54.920
bonds were not abated. Ordinances to abate these bonds will be on the council agenda tentatively

00:28:54.920 --> 00:29:24.760
November 17th of 2025 and then December 1st on 2025. So we have the 2013A bond that is paid through the Fire Improvement Fund, the 2014B bond that is a sewer bond that's paid through the sewer fund, the 2015A bond that is, it was a refunding bond so it had different pieces to it and so those individual pieces are paid

00:29:24.760 --> 00:29:53.020
by, I think it's Downtown TIF, the General Fund, and Stormwater Funds. The 2016 bond, which was, that was the bond that we did on this building, is paid by the General Fund. The 2018 bond is paid by Downtown TIF. The 2019A bond is paid by the Street Improvement Fund. The 2020 bond is also by the General Fund.

00:29:53.020 --> 00:29:55.660
and that amount is the

00:29:55.660 --> 00:30:23.740
amount is the pension obligation bonds from 2020. 2021 series is also a street improvement bond and then the 2022 bonds are also paid out of fire improvement. That's just some background just so when we get to abating these bonds you know why we want to do it. Very good. Thank you. Is there any other budget discussion? Alderman Clown. Greg, and this is just as a reminder,

00:30:24.000 --> 00:30:35.080
to back up what Michelle said, it's a yearly thing, so it's nothing, it's anything new to us, it's something that we do yearly, so just keep that in mind, you know.

00:30:35.280 --> 00:30:36.480
Yes, thank you.

00:30:38.800 --> 00:30:39.800
Nothing further.

00:30:43.760 --> 00:30:52.980
Item 10 is a motion that minutes of meetings shall be deemed approved when signed by the chair and the vice chair of the finance committee of the whole.

00:30:54.000 --> 00:31:23.580
That's a request Oh, okay. Could you elaborate on that? Yes. This way I don't have to keep track of those minutes until we start the budgeting season next year. We missed this motion last year so I had to hold two sets of minutes over. This way it just keeps it for the end. It keeps it for the end. It keeps it all in the same year and when the chair and the vice chair sign them then they're

00:31:23.580 --> 00:31:29.240
considered approved versus going before the whole council at the finance.

00:31:29.240 --> 00:31:30.080
September of the year.

00:31:30.080 --> 00:31:31.480
Yes, exactly.

00:31:32.120 --> 00:31:32.540
Thank you.

00:31:32.840 --> 00:31:33.700
Do you need any motion?

00:31:33.800 --> 00:31:35.720
We would need a motion and a second for that.

00:31:36.000 --> 00:31:36.280
Okay.

00:31:36.420 --> 00:31:43.860
I would make a motion that we provide those signatures for the paperwork needed.

00:31:44.400 --> 00:31:44.780
Second.

00:31:45.400 --> 00:31:47.000
Motion by Clemm.

00:31:47.500 --> 00:31:48.540
Second by Parker.

00:31:49.100 --> 00:31:50.320
Do we need a roll call?

00:31:50.440 --> 00:31:51.260
I don't really know.

00:31:51.720 --> 00:31:53.560
Do you want to do roll call just to be sure?

00:31:53.580 --> 00:32:23.580
just yeah that's fine. Clem. Aye. Johnson. Aye. Simmons. It's still absent. My apologies. Parker. Here. Yes. Stacy. Aye. Shadle. Aye. Sanders. Aye. And Sellers. Aye. The motion passes seven to zero. We're down to item 11 public comments. Anybody in the audience have anything?

00:32:23.580 --> 00:32:26.760
Seeing nothing, I would make a, take a motion for adjournment.

00:32:26.880 --> 00:32:27.440
So move.

00:32:27.540 --> 00:32:27.800
Second.

00:32:28.380 --> 00:32:31.200
Motion by Sellers, second by Parker, all in favor?

00:32:31.460 --> 00:32:31.760
Aye.

00:32:31.760 --> 00:32:31.980
Aye.

00:32:32.500 --> 00:32:33.460
And opposed.

00:32:34.760 --> 00:32:37.660
And then we'll start in about, you know, 6 or 5.